ISATIS GROUP Arikeh Sanat IsatisInstrumentation · Control · Safety

As found and as left on a calibration certificate: a worked example

Date
Reading
2 min read
Author
ISATIS editorial team
Measuring instrument on a calibration bench

Editorial illustration by ISATIS for this guide

Use a pressure gauge example to interpret before-and-after readings, the sign of an error and the limits of a single calibration point.

At a reference pressure of 10.00 bar, a certificate lists 10.12 in one column and 10.02 in the next. Which value describes the instrument that was in service yesterday? Read the column definitions and determine whether adjustment took place between the measurements.

Verify the identity first

Match the model and serial number to the instrument. Check the measured range, units, test date and any continuation sheets. A summary statement on the first page may not give results for each point. Resolve a serial-number mismatch before filing the record against an asset.

Apply the stated sign convention

If error is defined as instrument reading minus reference, the first value in the example is +0.12 bar and the second is +0.02 bar. A reported correction may use the opposite sign. As-found data describe the condition before adjustment. As-left data describe the reported condition at the end of the service.

Check What to record
Enquiry reference
Reference 10.00 bar
Before adjustment 10.12 bar, error +0.12 bar
As left 10.02 bar, error +0.02 bar

Check the quotation Specify the evidence you need at acceptance. Link each record to the equipment tag or serial and ask which results will appear in the delivered report.

What a good final result cannot establish

A satisfactory as-left reading does not determine how long an instrument previously operated outside an acceptance limit. For a review of past measurements, provide the original results, date of the previous satisfactory check and information about how the instrument was used. One point cannot establish the behaviour across the range.

Specify the service before sending the instrument

If original-condition results are required, request them before adjustment. Agree the measurement points, applicable tolerances and whether a statement of conformity is required. When that statement matters, check the reported uncertainty and agreed decision rule rather than judging from the displayed decimals alone.

Related equipment and quotations

Fluke equipment guide · Prepare an enquiry for ISATIS

Send us your datasheets, P&IDs or tender documents.

We review them and reply with a technical and commercial proposal.

info@iow.ir +98 21 2205 5712 Request a quote