A pallet near one corner can load a cell beyond a quarter of the total. Use the support loads, mounting details and junction box scope in the weighing enquiry.
Dividing the maximum payload by four is not sufficient to select a load cell for a four-support platform. Consider the platform's dead load and the distribution of load when material is placed away from the centre.
Describe the mechanical and electrical system
Provide the mounting arrangement, existing load cell code, cable route and indicator details. Identify analogue or digital cells and the type of junction box so the proposal can address the whole measurement chain.
A pallet placed near one corner
One support may carry more than a quarter of the total measured load. Ask the responsible designer for the governing support load and applicable allowances instead of treating the simple average as the design figure.
Enquiry checklist
| Item | What to record |
|---|---|
| Mechanics | Dead load, payload and support arrangement. |
| Sensor | Load cell type, range and mounting kit. |
| Signal | Junction box, cell interface and indicator. |
Check the quotation In addition to the sensor, identify the receiver that interprets its signal. Ask for the output and scaling of the proposed replacement in the units that receiver expects.
List the cell, mounting hardware and junction equipment separately. For a single replacement, include identification of the remaining installed cells.
Sample enquiry to ISATIS
Please quote load cells and interface equipment for the attached platform. State the governing selection load, cell type and compatibility with the existing indicator.

