ISATIS GROUP Arikeh Sanat IsatisInstrumentation · Control · Safety

Buying small spares: convert the net requirement into full packs

Date
Reading
1 min read
Author
ISATIS editorial team
Terminal blocks mounted on a rail

Editorial illustration by ISATIS for this guide

Convert a net requirement of 14 spares into ten-piece packs. Work from demand and usable stock to ordered quantity and the expected balance after the job.

Stores may issue markers or seals by the piece while the supplier quotes in packs. Record the engineering quantity, usable stock and purchase pack size in separate fields.

Calculate the net pieces first

Multiply the number of assemblies by the pieces used on each and subtract confirmed usable stock. Then round up to whole packs where the item is sold only in packs. Mark whether the quotation price is per pack or per piece.

Three panels, six markers per panel

The job needs 18 markers. With four usable markers in stores, the net requirement is 14. If each pack contains ten, two packs supply 20 pieces and leave six after the job.

Enquiry checklist

Item What to record
Consumption Pieces per assembly and number of assemblies.
Stock Usable pieces available for this job.
Order Number of packs and pieces in each pack.

Check the quotation Add the selling unit to each line: piece, set or pack. Request both the number of packs and the resulting number of usable pieces so quotations can be compared on the same basis.

State how surplus pieces will be recorded. This makes the receiving check and the next reorder consistent with the original calculation.

Sample enquiry to ISATIS

Please quote two packs of ten markers against a net requirement of fourteen pieces. Show the pack price and total quantity delivered.

Prepare an enquiry for ISATIS

Related equipment and reading

Send us your datasheets, P&IDs or tender documents.

We review them and reply with a technical and commercial proposal.

info@iow.ir +98 21 2205 5712 Request a quote