Two lines with the same nominal pipe size can need different orifice bores. Match each plate to its tag, measurement record and installation dimensions.
The nominal line size is not the orifice bore. Attach the tag and latest approved metering record to the plate photograph so the spare can be traced to the correct installation.
Separate hydraulic data from mechanical fit
Record the bore and its reference, material, thickness and carrier details. If only the plate is required, identify the fitting series and relevant dimensions. Changing the bore to suit a new duty is an engineering change and needs its own assessment.
Two parallel lines with the same nominal size
The records may show different tags and bores. An order for “two plates for identical lines” removes the distinction. Keep each tag on its own quotation line, even if the nominal pipe sizes match.
Enquiry checklist
| Item | What to record |
|---|---|
| Tag | Line identifier and approved metering record. |
| Plate | Bore, material and drawing number. |
| Associated items | Carrier and seals only where required. |
Check the quotation Send the line tag and mark exactly which item is being replaced on the existing meter drawing. Ask the bidder to identify any change to installation dimensions or to the signal used by the control system.
Ask which manufacturing reference and documents apply to each plate. For multiple items, identify the tag associated with each package and record at delivery.
Sample enquiry to ISATIS
Please quote only the plate for each tag against its latest approved record. Identify the basis of the bore, manufacturing reference and documents supplied with each line item.


