When a nameplate tag and drawing tag differ, build a cross-reference from the location, instrument record and approved changes before releasing the spare order.
A tag mismatch can send a correct spare to the wrong measurement point. Keep the conflicting references visible while tracing the installed instrument through its location, serial number and document revisions.
Build a short identification record
List the tag on the nameplate, the tag on the current drawing, the physical location and the serial number. Record dates or revisions of the loop drawing and maintenance record. Ask the asset owner to resolve open discrepancies.
PT-204 on the drawing, PT-104 in the request
These may be separate devices or a tag changed during a modification. Comparing the serial, process connection and location can narrow the identification. Neither a similar spelling nor a matching range proves the tags are equivalent.
Enquiry checklist
| Item | What to record |
|---|---|
| Installed identity | Nameplate, serial and location. |
| Documentation | Drawing tag, revision and date. |
| Decision | Confirmed mapping and person or record approving it. |
Check the quotation Label each photograph with the location where it was taken and keep the two identifiers separate in the requisition until the owner confirms which record applies.
Attach the confirmed mapping to the enquiry and preserve the old reference for traceability. This prevents the discrepancy from returning at receipt.
Sample enquiry to ISATIS
Please quote against the confirmed asset identity in the attached tag cross-reference. Show both document references and the governing instrument serial.

