An actuator may make 24 moves across a shift or all in its first hour. Use the peak operating pattern when comparing duty ratings and allowable starts.
Actuators with similar nominal torque can be intended for quite different duty cycles. State whether the valve makes full open-close movements or frequent position corrections.
Separate full travel from individual starts
Describe a representative operating cycle instead of saying “continuous duty.” Ask operations for full movements per shift, starts in the busiest hour, required travel time and positioning command. Check permissible duty for the actual motor and actuator code.
Why a shift average can conceal peak duty
Twenty-four movements in an eight-hour shift average three per hour, but all 24 could occur in the first hour. Include the concentrated operating period as well as the average when assessing the actuator.
Enquiry checklist
| Item | What to record |
|---|---|
| Travel time | Required time for a complete stroke. |
| Peak duty | Maximum starts in the relevant operating interval. |
| Control | Open-close or positioning duty and required feedback. |
Check the quotation Draw a boundary around what should arrive in the box. Keep any mating part that will be reused visible on the drawing, and request confirmation of its interface with the new part.
Request the declared duty limits and their relationship to the stated cycle. Confirm supply voltage and phase count against the panel that will feed the unit.
Sample enquiry to ISATIS
Please quote for the attached operating profile. Confirm duty in the busiest hour, full-travel time, control mode and electrical supply for the proposed code.

